Shanghai flywheel completes 100 cycles as testing advances
Qnetic says its 200 kilowatt-hour prototype finished 100 charge-and-discharge cycles without faults or measurable capacity loss. The milestone came before integrated low-speed testing in Shanghai.

A 200 kilowatt-hour flywheel prototype has completed 100 continuous charge-and-discharge cycles without faults, its maker Qnetic says, before moving into integrated low-speed testing at the company’s technology centre in Shanghai. Qnetic reported the cycle milestone in September; it has not said how much energy moved in each cycle, how long they lasted or what power level the test used.
The test is an early check of a different approach to storing electricity. Rather than holding energy through chemical reactions, the Pulsar system stores it in a spinning carbon-fibre rotor suspended by magnetic bearings inside a steel housing. The company says the prototype is designed to store 200 kilowatt-hours, with a route to 500 kilowatt-hours on the same platform.
What the test has shown
A flywheel stores energy as motion: electricity speeds up the rotor, and the system can generate electricity again as the rotor slows. Magnetic bearings keep the rotor from touching the housing, reducing contact and friction. Qnetic, a Sacramento-based startup, is developing the system as an alternative to batteries, which can lose capacity through chemical degradation during repeated use.
The 100-cycle result does not mean Pulsar has been tested at full operating speed. Qnetic says the mechanical assembly was completed in June and underwent structural checks before spinning under its own power. In a separate test, the motor alone exceeded 11,000 revolutions per minute, producing 130 kilowatts at 97.3 per cent efficiency. Those figures are not results from the complete flywheel at full speed.
What remains unproven
The company has not disclosed the energy transferred, duration or power level of each of the 100 cycles. Those details would help show how the prototype performs under operating conditions. Qnetic says its staged testing is intended to reduce technical risk before the system reaches full speed or a customer site.
Qnetic is sharing test results with the Electric Power Research Institute, which the company describes as an independent body. Its assessment has not been announced. The next challenge includes scaling production of the composite rotors; the source does not say when full-speed testing or deployment will begin.
This report draws on information from Energies Media.
Editorial checks passed Facts, figures and quotes checked against 1 source
Add Shanghai News as a preferred source on Google



